MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Southern Berkshire Chamber     Lee Chamber     Lenox Chamber     Berkshire Community College    
Search
Great Barrington Announces Road Work Projects
12:23PM / Monday, April 24, 2023
Print | Email  

GREAT BARRINGTON, Mass. — The town has announced Phase 1 of this year's street improvement projects throughout town.
 
Street paving and other work will take place at the following locations:
  • Commonwealth Avenue
  • Locust Street
  • Giddings Street
  • Ramsey Avenue
  • Meadow Lane (GB)
  • Stillwell Avenue
  • Cooper Road
The low bidder for these jobs was Williams Paving from West Stockbridge, with a price of $592,768.80
 
Construction gets underway around May 15, weather permitting.
 
Work includes reclaiming the existing pavement, reshaping and compacting the road with rollers then placing a binder and top pavement. There will also be minor drainage work involved. Milling, grading and compaction are anticipated at all locations prior to paving. These roads will be in a compacted gravel condition for a period of time before any pavement is placed. 
 
Also, there will be some water main replacements on Giddings and Laurel Streets beginning in mid-April.
 
The Highway Department will announce additional projects as they are scheduled during the construction season.
0Comments
More Featured Stories
SouthBerkshires.com is owned and operated by: Boxcar Media 102 Main Sreet, North Adams, MA 01247 -- T. 413-663-3384
© 2024 Boxcar Media LLC - All rights reserved